Analisis biaya dan waktu proyek renovasi area parkir rumah sakit AMC Cileunyi Kabupaten Bandung

Authors

  • Said Bambang Nurcahya Politeknik Pajajaran ICB

DOI:

https://doi.org/10.32670/fairvalue.v5i6.2880

Keywords:

Cirtical Ratio; Schedule Performance Index ; Cost Performance Index; Budget Cost Work Schedul); Actual Cost Work Performance; Budget Cost Work Performance

Abstract

The purpose of this study was to analyze the cost and time of work in the AMC Hospital parking area. The research was carried out using a descriptive method by asking questions about current problems, so that a cost and time analysis was determined using the theories of the budget cost work schedule (BCWS), actual cost work performance (ACWP), and budget cost work performance (BCWP), and the use of the concept of earned value in evaluating project performance can be calculated by various factors that indicate the progress and performance of project implementation. The results of research on cost efficiency and time effectiveness used by contractors in working on parking area projects according to productivity and performance, cost index projections, and project final schedules use the Critical Ratio (CR): Schedule Performance Index (SPI) x Cost Performance Index (CPI).

References

Alverina, C., & Tamtana, J. S. (2020). Analisis Biaya Pelaksanaan Proyek Konstruksi Gedung Bertingkat Dengan Konsep Konstruksi Hijau. JMTS: Jurnal Mitra Teknik Sipil, 3(2), 245.

Dharmayanti, G. A. P. C., & Nadiasa, M. (2015). ANALISIS RISIKO PADA PROYEK RENOVASI DAN PENGEMBANGAN GEDUNG HOTEL. Seminar Nasional Sains Dan Teknologi (Senastek).

Febri, E. K. A. R. D. (2015). Analisis Kinerja Biaya dan Waktu Dengan Metode Nilai Hasil (Earned Value Analysis) Pada Pekerjaan Renovasi Tahap II Asrama Wana Mulia SMK Kehutanan Samarinda. KURVA MAHASISWA, 4(1), 685–692.

Hafidhi, G. P., Bharoto, B., & Sudarwanto, B. (2021). Perancangan Rumah Sakit Umum Muhammadiyah Kota Bandung dengan Penerapan Smart Hospital. Fakultas Teknik Universitas Diponegoro.

Hardiyanto, S. (2020). Optimalisasi Proyek Pembangunan Gedung Parkir Dan Masjid RSUD Pare Oleh PT Arwi Graha Sejahtera Dengan Metode Jalur Kritis (Critical Path Method). Jurnal Simki Unp, 01, 1–13.

Henri, K. N. (2021). Analisis Kinerja Biaya dan Waktu dengan Metode Nilai Hasil (Studi Kasus: Renovasi Gedung PT GD Indonesia, Kab. Gresik, Jawa Timur). Universitas Gadjah Mada.

Lestari, R. P. (2013). Analisis pengaruh budaya kerja eksplisit dan implisit terhadap perilaku kerja dan kinerja karyawan (Studi Kasus pada CV. Pilars Konsultan dan CV. Wijasena Konsultek Jember).

Pahalawan, F. A. (2014). Analisa Konsep Nilai Hasil (Earned Value Analysis) Terhadap Waktu dan Biaya Pada Pekerjaan Proyek Pembangunan Gedung (Studi Kasus Pembangunan Gedung MCS SBU II Surabaya).

Ramadhan, M. H. (2022). Analisis Kinerja dan Estimasi Terhadap Biaya dan Waktu Menggunakan Earned Value Analysis Pada Proyek Pembangunan Gedung Baru dan Renovasi Polda Jatim. Universitas Pembangunan Nasional" Veteran" Jawa Timur.

Rasyid, M. R. A. R. (2017). Perancangan Sistem Pengukuran Kinerja menggunakan Balanced Scorecard pada Perusahaan Jasa Konstruksi (Studi Kasus: Perusahaan A). Skripsi.

Robi’in, M. A. (2021). Pengendalian Waktu Dan Biaya Pada Proyek Peningkatan Jalan Menggunakan Metode Earned Value (Studi Kasus: Jalan Betoyo-Dagang Kecamatan Manyar Kabupaten Gresik). DEARSIP: Journal of Architecture and Civil, 1(1), 45–56.

Sugiyono. (2019). Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Alfabeta.

Sujarwo, A., & Oetomo, W. (2022). Analisis Waktu dan Biaya Pembangunan Gedung IKFM, IPS, IPL Dan Parkir Kendaraan Karyawan. Jurnal Kacapuri : Jurnal Keilmuan Teknik Sipil, 5(1), 269.

Susanti, B., Melisah, M., & Juliantina, I. (2019). Penerapan Konsep Earned Value Pada Proyek Konstruksi Jalan Tol (Studi Kasus Ruas Jalan Tol Kayuagung-Palembang-Betung). Jurnal Rekayasa Sipil, 15(1), 12–20.

Yuliani, W. (2018). Metode penelitian deskriptif kualitatif dalam perspektif bimbingan dan konseling. Quanta, 2(2), 83–91.

Downloads

Published

2023-01-25

How to Cite

Nurcahya, S. B. . (2023). Analisis biaya dan waktu proyek renovasi area parkir rumah sakit AMC Cileunyi Kabupaten Bandung. Fair Value: Jurnal Ilmiah Akuntansi Dan Keuangan, 5(6), 2677–2681. https://doi.org/10.32670/fairvalue.v5i6.2880